5,000SF, May 2022 - April 2023 Phase 1 was the construction of a new 4,950 sf Multi-Purpose building to help
-
date: 02 Nov 2018
-
client: Wells Fargo Northstar
-
location: Des Moines, IA
Wells Fargo Northstar
Pennacle Construction has been working with Wells Fargo in Des Moines since 2012. In July 2017, disaster struck the Wells Fargo Northstar Building as a roof-drain pipe burst on the level of the third floor. Pennacle was asked to come in to gut and remodel the areas with water damage affecting floors 1-3. The renovation space covered over 80,000 square feet. The project included replacing all ceilings and carpet along with the bottom 2 feet of drywall on all walls.
The space was shared between Wells Fargo and another leasing tenant. The work was split into three phases; Wells Fargo space, leased tenant space and shared common space. Pennacle completed all the work in 4 months when all employees were able to return to their work space.