Spotlight Archives - Graham Construction https://grahamconstruction.com/tag/spotlight/ Building what's important. Wed, 12 Jul 2023 15:58:01 +0000 en-US hourly 1 https://wordpress.org/?v=6.3.2 https://grahamconstruction.com/wp-content/uploads/2016/07/cropped-favicon-2-32x32.png Spotlight Archives - Graham Construction https://grahamconstruction.com/tag/spotlight/ 32 32 World Class Industries Project https://grahamconstruction.com/ad_project/world-class-industries%e2%80%afproject/ Thu, 24 Feb 2022 15:54:43 +0000 https://grahamconstruction.com/?post_type=ad_project&p=3947 65,000sf, September 2018 – June 2019 The World Class Industries’ new facility sits on 13 acres and includes 10,000 SF of new corporate office space and 53,000 SF of new warehouse space. The entrance has floor-to-ceiling storefront and glazing, with a custom metal panel canopy and soffit system. The office […]

The post World Class Industries Project appeared first on Graham Construction.

]]>
65,000sf, September 2018 – June 2019

The World Class Industries’ new facility sits on 13 acres and includes 10,000 SF of new corporate office space and 53,000 SF of new warehouse space.

The entrance has floor-to-ceiling storefront and glazing, with a custom metal panel canopy and soffit system. The office area includes 13 private offices and 4,000 SF of open office space with modular office furniture. Employee areas include four restrooms, two breakrooms, three conference rooms and a training room with automated shade control and audio/video equipment. The floor finishes in the new office space consist of carpet flooring, ceramic tile, luxury vinyl tiling and sealed concrete. The reception area has a custom fabricated reception desk with a floor to ceiling mural clad to the back wall behind the desk.

Working well with the city of Hiawatha was crucial to completing the project on time. By developing a good relationship early in the project, the city of Hiawatha understood what Graham was trying to accomplish. During freezing temperatures, they assisted Graham with multiple inspections so Graham could proceed with the schedule.

With the final site work to start in May, spring rain began to cause an issue. The team worked long hours and Saturdays. Graham and the contractors all worked together to help coordinate their efforts with equipment and overtime needed to hit the schedule. With all this hard work, Graham consolidated seven weeks into four.

The post World Class Industries Project appeared first on Graham Construction.

]]>
St Luke’s Hospital https://grahamconstruction.com/ad_project/st-lukes-hospital/ Thu, 24 Feb 2022 15:34:56 +0000 https://grahamconstruction.com/?post_type=ad_project&p=3929 2005 and ongoing projects list UnityPoint St. Luke’s Hospital in Cedar Rapids, IA and Graham Construction have a long and successful history together. Our first major project was back in 2006 with the construction and renovation of their Emergency Department, Pharmacy, ICU and Surgery areas. The project consisted of a […]

The post St Luke’s Hospital appeared first on Graham Construction.

]]>
2005 and ongoing projects list

UnityPoint St. Luke’s Hospital in Cedar Rapids, IA and Graham Construction have a long and successful history together. Our first major project was back in 2006 with the construction and renovation of their Emergency Department, Pharmacy, ICU and Surgery areas. The project consisted of a total of 118,980 square feet of which 21,350 was an addition, and 97,630 square feet was a renovation. These areas were occupied and operational during construction requiring multiple phases and strict adherence to a Risk Assessment and Infection Control plan. Since then, we have completed numerous projects for them including CT & Imaging Rooms, MRI Suite Renovation, Patient Floor Remodel, Pain Clinic, Rehab Gym, Vascular Lab, Heart Center Renovation, 3rd Floor renovation, MOP Multi-specialty Clinic renovation, and Resource Center, to name only a few. “Graham Construction never skipped a beat or had a patient complaint related to construction. There is an element of trust that rarely happens.” Says former CEO Ted Townsend.

The post St Luke’s Hospital appeared first on Graham Construction.

]]>
Methodist Jennie Edmundson Medical Plaza https://grahamconstruction.com/ad_project/methodist-jennie-edmundson-medical-plaza/ Wed, 09 Sep 2020 18:43:48 +0000 https://grahamconstruction.com/?post_type=ad_project&p=2893 The Methodist Jennie Edmundson Medical Plaza is a project that not only transformed the Jennie Edmundson Campus, but transformed a centralized intersection of the city of Council Bluffs. The project was first started in the summer of 2018 with the construction of a soil nail retaining wall and two new […]

The post Methodist Jennie Edmundson Medical Plaza appeared first on Graham Construction.

]]>
The Methodist Jennie Edmundson Medical Plaza is a project that not only transformed the Jennie Edmundson Campus, but transformed a centralized intersection of the city of Council Bluffs. The project was first started in the summer of 2018 with the construction of a soil nail retaining wall and two new staff parking lots in order to open up the current lot for demolition. The three stories of this building are approximately 20,000 SF each and the first two were finished for Methodist Physicians Clinic. The 3rd floor has 4,500 SF finished for Midwest Gastrointestinal Clinic and Infusion and the remainder of the 3rd floor has been left as a shell space for future expansion. This building features a stone facade, highlighted with a full height metal panel feature wall and full height curtain wall system. The first floor serves as a family practice with 36 exam/treatment rooms, an X-Ray suite and three centralized nurse stations. The second floor is Women’s Services and includes a peri-natal suite as well as a stand-alone imaging suite. 28 exam/treatment rooms, 5 ultrasound rooms, a dexa room, mammography room and four centralized nurse stations equip the staff on second floor to manage all functions of the space.

The post Methodist Jennie Edmundson Medical Plaza appeared first on Graham Construction.

]]>
Dowling Catholic High School – St. Joseph Chapel https://grahamconstruction.com/ad_project/dowling-catholic-high-school/ Wed, 07 Nov 2018 19:50:40 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1659 The Dowling Catholic High School St. Joseph Chapel project is a 11,600 SF spectacular addition to the front entrance of the campus. The exterior north plaza entry will provide a safe student drop-off area year-round as you approach the school and admire the 21’ cross positioned 61’ above the main […]

The post Dowling Catholic High School – St. Joseph Chapel appeared first on Graham Construction.

]]>
The Dowling Catholic High School St. Joseph Chapel project is a 11,600 SF spectacular addition to the front entrance of the campus. The exterior north plaza entry will provide a safe student drop-off area year-round as you approach the school and admire the 21’ cross positioned 61’ above the main entrance to the campus. The project includes a Nave to seat 350 students/faculty/staff, a large greeting area and check-in desk, restrooms, and choir balcony. The brick-faced, 30’-0” tall single story structural precast exterior is accented by curtain walls at two entrances with a large stained glass “Wall of Saints” highlighting the southwest entrance. Constructing the Chapel at the main entrance to the school and installing a new main drive to the campus, while providing safe and efficient access to the building and parking for the families, students, staff and visitors to DCHS, was the main challenge of the project.

The post Dowling Catholic High School – St. Joseph Chapel appeared first on Graham Construction.

]]>
Federal Home Loan Bank Building https://grahamconstruction.com/ad_project/federal-home-loan-bank-building/ Wed, 07 Nov 2018 18:06:06 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1785 Federal Home Loan Bank purchased the 909 Locust property in 2017 and partnered with Graham Construction to perform the large renovation project. This project has a quick turn-around time based on the Federal Home Loan Bank’s need for new office space at this location. The building is comprised of 6 […]

The post Federal Home Loan Bank Building appeared first on Graham Construction.

]]>
Federal Home Loan Bank purchased the 909 Locust property in 2017 and partnered with Graham Construction to perform the large renovation project. This project has a quick turn-around time based on the Federal Home Loan Bank’s need for new office space at this location. The building is comprised of 6 floors, with approximately 34,500 SF on floor 1 & 2, and 36,000 SF on floors 3 through 6. Federal Home Loan Bank will be renovating approximately 50% of the 4th floor and the entirety of floors 5 and 6. In addition to renovation of the Federal Home Loan Bank’s own office space on floors 4-6, there will also be a complete renovation of 1st floor, as well as exterior site improvements.

Graham Construction was the original builder and has done all maintenance/remodel work since the building opened in 1997. Graham has also performed all the tenant improvement work that has taken place within the building since its purchase by Federal Home Loan Bank.

The post Federal Home Loan Bank Building appeared first on Graham Construction.

]]>
Fred Maytag II Scout Center https://grahamconstruction.com/ad_project/fred-maytag-ii-scout-center/ Wed, 07 Nov 2018 17:35:50 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1649 The Mid-Iowa Council of the Boy Scouts of America was in need of an expanded office and scout center when they turned to Graham Construction. Graham helped guide them through the design and pre-construction phase of a new 24,000 square foot facility. In addition, Graham also helped with fund raising […]

The post Fred Maytag II Scout Center appeared first on Graham Construction.

]]>
The Mid-Iowa Council of the Boy Scouts of America was in need of an expanded office and scout center when they turned to Graham Construction. Graham helped guide them through the design and pre-construction phase of a new 24,000 square foot facility. In addition, Graham also helped with fund raising and shepherding the project through their forty-seven member board that all had different visions of what the facility should be.

The completed building is a LEED Certified mixed use building with offices, training rooms and a scout shop. The building occupies a 16 acre site with amenities such as a pond, an outdoor activity area and a 250 seat natural amphitheater with fire pit and the 12 laws of scouting carved in wood timber totems. The building is constructed with an exposed heavy wood timber structure and exposed tongue and groove wood ceilings.

The post Fred Maytag II Scout Center appeared first on Graham Construction.

]]>
Graham Apollo Warehouse https://grahamconstruction.com/ad_project/graham-apollo-warehouse/ Wed, 07 Nov 2018 17:30:40 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1655 Graham Construction partnered with The Graham Group to construct a 600,000 square foot general commodity warehouse for XPO Logistics in Des Moines, IA. This building is the second largest single building in Polk County. The tenant required a 125,000 square foot space that could maintain 50 degrees at 50% humidity […]

The post Graham Apollo Warehouse appeared first on Graham Construction.

]]>
Graham Construction partnered with The Graham Group to construct a 600,000 square foot general commodity warehouse for XPO Logistics in Des Moines, IA. This building is the second largest single building in Polk County. The tenant required a 125,000 square foot space that could maintain 50 degrees at 50% humidity which required an insulated demising wall and special construction to avoid condensation.

The building is a 24’ clear conventional steel frame with load bearing precast exterior walls and 60 mil TPO roof. The loading dock area has 48 dock doors and two on grade accessible overhead doors. The building uses an Early Suppression Fast Response (ESFR) fire sprinkler system.

The post Graham Apollo Warehouse appeared first on Graham Construction.

]]>
Compass Memorial Healthcare https://grahamconstruction.com/ad_project/marengo/ Wed, 07 Nov 2018 16:30:57 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1651 In the spring of 2014, Compass Medical Center went through a Master Facility Planning process with The Graham Construction and Hoefer Wysocki Architecture. They needed to address many issues with their facility to continue to provide top quality care to their community. The Master Plan identified the need for three […]

The post Compass Memorial Healthcare appeared first on Graham Construction.

]]>
In the spring of 2014, Compass Medical Center went through a Master Facility Planning process with The Graham Construction and Hoefer Wysocki Architecture. They needed to address many issues with their facility to continue to provide top quality care to their community. The Master Plan identified the need for three separate additions and several renovated departments. The East Addition will expand Physical Therapy, Dietary and support areas while also creating a new front entry and connection to the clinic. There was also an addition to the Surgery Department and the patient wing to add much needed space.

The project required six separate phases in order to maintain continuous operations of the hospital. The additions were constructed during phases one, two and five. Renovations of the Central Physical Plant, Dialysis, Emergency, Pharmacy, Obstetrics as well as Family Practice and Specialty Clinics occurred throughout phases two through six. Coordinating these phases and maintaining infection control and continuous operations made this a challenging project.

The post Compass Memorial Healthcare appeared first on Graham Construction.

]]>
Simpson College – Blank Performing Arts Center https://grahamconstruction.com/ad_project/simpson/ Wed, 07 Nov 2018 01:51:20 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1663 The Blank Performing Arts Center on the campus of Simpson College was originally built in the 1970’s and houses campus productions as well as the Des Moines Metropolitan Opera. It is a wonderful venue but was short on office and classroom space and was not ADA compliant. Simpson College turned […]

The post Simpson College – Blank Performing Arts Center appeared first on Graham Construction.

]]>
The Blank Performing Arts Center on the campus of Simpson College was originally built in the 1970’s and houses campus productions as well as the Des Moines Metropolitan Opera. It is a wonderful venue but was short on office and classroom space and was not ADA compliant. Simpson College turned to SVPA Architects and Graham Construction to build an 18,000 square foot, three story LEED Silver addition to the facility. The main level adds a spectacular new front entry and additional lobby space, restrooms and offices. Three large theater classrooms and new restrooms occupy the second level. The basement level addition provides ADA elevator access to the lower level and ADA accessible seating was also added to the main auditorium. Some of the highlights of the LEED Silver Certification are a geothermal HVAC system, views of natural light from 75% of the spaces, underground water retention, and pervious paving.

The post Simpson College – Blank Performing Arts Center appeared first on Graham Construction.

]]>
Shenandoah Medical Center https://grahamconstruction.com/ad_project/shenandoah-medical-center/ Mon, 05 Nov 2018 15:11:22 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1884 Shenandoah Medical Center in Shenandoah, Iowa selected Graham when the time came to add space to accommodate their growing volumes. Their 30-month project consisted of a new 45,000 square foot Medical Office Building that houses both their Family Practice Clinic and Outpatient Specialty Clinic. They also addressed some other needs […]

The post Shenandoah Medical Center appeared first on Graham Construction.

]]>
Shenandoah Medical Center in Shenandoah, Iowa selected Graham when the time came to add space to accommodate their growing volumes. Their 30-month project consisted of a new 45,000 square foot Medical Office Building that houses both their Family Practice Clinic and Outpatient Specialty Clinic. They also addressed some other needs by renovating and expanding their Emergency Department and relocating their Lab services area. The relocation of the Lab allowed for a much-needed expansion of their Surgical Suite. The three-phase project has turned over the MOB while the 24,000 square foot of renovation turn over approximately one year later.

Some of the challenges during construction included; keeping the existing Lab operational within a Surgery Suite that was undergoing a complete renovation, remodeling the Emergency Department in multiple phases to allow the department to remain open, value-engineering $3MM out of the original cost to bring the project within budget, and completing over $400,000 of owner added scope items without adding additional time to the overall schedule. There was also 6 weeks of rain delay during completion of the site work and exterior of the new MOB. Graham was able to absorb this delay into the schedule and finish on time.

The post Shenandoah Medical Center appeared first on Graham Construction.

]]>