Industrial Archives - Graham Construction https://grahamconstruction.com/category/4-industrial/ Building what's important. Thu, 20 Jul 2023 17:20:24 +0000 en-US hourly 1 https://wordpress.org/?v=6.3.2 https://grahamconstruction.com/wp-content/uploads/2016/07/cropped-favicon-2-32x32.png Industrial Archives - Graham Construction https://grahamconstruction.com/category/4-industrial/ 32 32 Electrical Power Products https://grahamconstruction.com/ad_project/electrical-power-products/ Thu, 20 Jul 2023 17:20:24 +0000 https://grahamconstruction.com/?post_type=ad_project&p=5871 August 2020 – May 2021 Warehouse addition of precast concrete panels and structural metal steel. Interior includes restrooms and offices in a mezzanine area above. Parking lot expansion to the north of the existing lot. One dock with 2 exterior overhead doors. 3 large door openings were cut into existing […]

The post Electrical Power Products appeared first on Graham Construction.

]]>
August 2020 – May 2021

Warehouse addition of precast concrete panels and structural metal steel. Interior includes restrooms and offices in a mezzanine area above. Parking lot expansion to the north of the existing lot. One dock with 2 exterior overhead doors. 3 large door openings were cut into existing exterior precast for connection to the addition.

The post Electrical Power Products appeared first on Graham Construction.

]]>
Graham Group Altoona Warehouses https://grahamconstruction.com/ad_project/graham-group-altoona-warehouses/ Thu, 20 Jul 2023 13:24:38 +0000 https://grahamconstruction.com/?post_type=ad_project&p=5861 July 2019 – December 2022 Overall project consists of 4 precast warehouse buildings and associated paving, landscaping, a large retention pond and public improvement road. Building 1: 270,000 SF Building 2: 270,000 SF Building 3: 300,000 SF Building 4: 300,000 SF

The post Graham Group Altoona Warehouses appeared first on Graham Construction.

]]>
July 2019 – December 2022

Overall project consists of 4 precast warehouse buildings and associated paving, landscaping, a large retention pond and public improvement road.

Building 1: 270,000 SF

Building 2: 270,000 SF

Building 3: 300,000 SF

Building 4: 300,000 SF

The post Graham Group Altoona Warehouses appeared first on Graham Construction.

]]>
Lely North America Hub https://grahamconstruction.com/ad_project/lely-north-america-hub/ Wed, 12 Jul 2023 17:11:23 +0000 https://grahamconstruction.com/?post_type=ad_project&p=5636 October 2020 – March 2022 94,936 SF New green field site build of production hall and office/training space. Includes sitework, paving, utilities. MEP Design Build. Building was made out for precast concrete and curtain wall.  

The post Lely North America Hub appeared first on Graham Construction.

]]>
October 2020 – March 2022

94,936 SF

New green field site build of production hall and office/training space. Includes sitework, paving, utilities. MEP Design Build. Building was made out for precast concrete and curtain wall.

 

The post Lely North America Hub appeared first on Graham Construction.

]]>
World Class Industries Project https://grahamconstruction.com/ad_project/world-class-industries%e2%80%afproject/ Thu, 24 Feb 2022 15:54:43 +0000 https://grahamconstruction.com/?post_type=ad_project&p=3947 65,000sf, September 2018 – June 2019 The World Class Industries’ new facility sits on 13 acres and includes 10,000 SF of new corporate office space and 53,000 SF of new warehouse space. The entrance has floor-to-ceiling storefront and glazing, with a custom metal panel canopy and soffit system. The office […]

The post World Class Industries Project appeared first on Graham Construction.

]]>
65,000sf, September 2018 – June 2019

The World Class Industries’ new facility sits on 13 acres and includes 10,000 SF of new corporate office space and 53,000 SF of new warehouse space.

The entrance has floor-to-ceiling storefront and glazing, with a custom metal panel canopy and soffit system. The office area includes 13 private offices and 4,000 SF of open office space with modular office furniture. Employee areas include four restrooms, two breakrooms, three conference rooms and a training room with automated shade control and audio/video equipment. The floor finishes in the new office space consist of carpet flooring, ceramic tile, luxury vinyl tiling and sealed concrete. The reception area has a custom fabricated reception desk with a floor to ceiling mural clad to the back wall behind the desk.

Working well with the city of Hiawatha was crucial to completing the project on time. By developing a good relationship early in the project, the city of Hiawatha understood what Graham was trying to accomplish. During freezing temperatures, they assisted Graham with multiple inspections so Graham could proceed with the schedule.

With the final site work to start in May, spring rain began to cause an issue. The team worked long hours and Saturdays. Graham and the contractors all worked together to help coordinate their efforts with equipment and overtime needed to hit the schedule. With all this hard work, Graham consolidated seven weeks into four.

The post World Class Industries Project appeared first on Graham Construction.

]]>
Graham Apollo Warehouse https://grahamconstruction.com/ad_project/graham-apollo-warehouse/ Wed, 07 Nov 2018 17:30:40 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1655 Graham Construction partnered with The Graham Group to construct a 600,000 square foot general commodity warehouse for XPO Logistics in Des Moines, IA. This building is the second largest single building in Polk County. The tenant required a 125,000 square foot space that could maintain 50 degrees at 50% humidity […]

The post Graham Apollo Warehouse appeared first on Graham Construction.

]]>
Graham Construction partnered with The Graham Group to construct a 600,000 square foot general commodity warehouse for XPO Logistics in Des Moines, IA. This building is the second largest single building in Polk County. The tenant required a 125,000 square foot space that could maintain 50 degrees at 50% humidity which required an insulated demising wall and special construction to avoid condensation.

The building is a 24’ clear conventional steel frame with load bearing precast exterior walls and 60 mil TPO roof. The loading dock area has 48 dock doors and two on grade accessible overhead doors. The building uses an Early Suppression Fast Response (ESFR) fire sprinkler system.

The post Graham Apollo Warehouse appeared first on Graham Construction.

]]>
PDM Precast https://grahamconstruction.com/ad_project/pdm/ Wed, 07 Nov 2018 15:45:22 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1658 Graham Construction partnered with PDM Precast in 2017 to build a new batch plant.  The 5,200 SF facility consisted of a batch plant, restroom, office/control room, mechanical room, aggregate bin storage and admixture storage.  The building envelope was completely precast with EPDM roof. Motorized overhead doors were cut into the […]

The post PDM Precast appeared first on Graham Construction.

]]>
Graham Construction partnered with PDM Precast in 2017 to build a new batch plant.  The 5,200 SF facility consisted of a batch plant, restroom, office/control room, mechanical room, aggregate bin storage and admixture storage.  The building envelope was completely precast with EPDM roof. Motorized overhead doors were cut into the precast to allow aggregate belts to enter and drop aggregate into the storage bins. Interior walls were metal studs and drywall.

Graham Construction was on board to oversee grading and site utilities, excavation and foundations, concrete, precast and building enclosure, roofing and interior finishes (framing, drywall, FRP, paint, specialties, doors, frames, hardware).

The equipment came from Germany and was installed on site.  Advance Concrete Technologies (ACT) was hired to procure and install all batch equipment.

The post PDM Precast appeared first on Graham Construction.

]]>
DuPont Pioneer https://grahamconstruction.com/ad_project/1842/ Fri, 02 Nov 2018 20:25:14 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1842 DuPont Pioneer teamed with Graham Construction to remodel an existing office space to welcome a new business division, Granular Inc. Granular Inc. was purchased by DuPont in 2017. They develop and market farm management software. The space needed to be repurposed into an office space that fit Granular’s tech savvy […]

The post DuPont Pioneer appeared first on Graham Construction.

]]>
DuPont Pioneer teamed with Graham Construction to remodel an existing office space to welcome a new business division, Granular Inc. Granular Inc. was purchased by DuPont in 2017. They develop and market farm management software. The space needed to be repurposed into an office space that fit Granular’s tech savvy business environment while maintaining the budget that DuPont Pioneer was looking for.

The design is an open space concept with upgrades to the kitchen and collaborative spaces as well as an expansion to the existing exterior deck. Upgrades included brick feature walls, custom furniture, game room, café space, mother’s rooms, and break out areas. Tiered seating was added for team breakouts and presentations. Interior brick walls and glazed walls were added to give the space the comfort and feeling desired.

The post DuPont Pioneer appeared first on Graham Construction.

]]>
Maffitt Water Treatment Plant https://grahamconstruction.com/ad_project/maffitt-water-treatment-plant/ Fri, 02 Nov 2018 20:10:08 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1838 Graham Construction was selected for their cost proposal and their voluntary cost and design alternates, which were based upon 20% complete construction documents. Graham Construction then worked directly with the owner and design team to complete construction documents. In working directly with the owner and design team, Graham Construction was […]

The post Maffitt Water Treatment Plant appeared first on Graham Construction.

]]>
Graham Construction was selected for their cost proposal and their voluntary cost and design alternates, which were based upon 20% complete construction documents. Graham Construction then worked directly with the owner and design team to complete construction documents. In working directly with the owner and design team, Graham Construction was able to help lower the cost of the plant below the original budget. The project was also scheduled so that final design and construction progressed simultaneously, with each part going out in separate bid packages, allowing the project to be finished within a shorter time frame.

The post Maffitt Water Treatment Plant appeared first on Graham Construction.

]]>
LGI Research & Development Lab https://grahamconstruction.com/ad_project/lgi-research-development-lab/ Fri, 02 Nov 2018 20:07:20 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1832 When the Lauridsen Group, Inc. (LGI) decided to expand their corporate campus with the addition of a research and development laboratory, they once again turned to Graham Construction. LGI and Graham have now teamed together for their third project. The R & D Lab was built adjacent to their corporate […]

The post LGI Research & Development Lab appeared first on Graham Construction.

]]>
When the Lauridsen Group, Inc. (LGI) decided to expand their corporate campus with the addition of a research and development laboratory, they once again turned to Graham Construction. LGI and Graham have now teamed together for their third project.

The R & D Lab was built adjacent to their corporate headquarters and serves several of their companies’ research needs. The 21,422 square foot facility houses four independent labs for Proliant Meats, Proliant Dairy, Proliant Biologics and APC as well as a shared 5,000 square foot Pilot Plant. The Pilot Plant is used for small batch test manufacturing of new products. The building also provides office space for researchers, training and conference center and a research kitchen.

The post LGI Research & Development Lab appeared first on Graham Construction.

]]>
Dee Zee Warehouse https://grahamconstruction.com/ad_project/dz-warehouse/ Fri, 02 Nov 2018 20:02:15 +0000 http://dev.grahamconstruction.com.php72-38.lan3-1.websitetestlink.com/?post_type=ad_project&p=1828 Graham Construction built a second facility for Dee Zee manufacturing. This warehouse is a 100,000 square foot facility for general commodity storage. The building is a 24’ clear conventional steel frame with load bearing precast exterior walls and 60 mil TPO roof. The loading dock area has 9 dock doors […]

The post Dee Zee Warehouse appeared first on Graham Construction.

]]>
Graham Construction built a second facility for Dee Zee manufacturing. This warehouse is a 100,000 square foot facility for general commodity storage. The building is a 24’ clear conventional steel frame with load bearing precast exterior walls and 60 mil TPO roof. The loading dock area has 9 dock doors with 50,000 lb dock levelers and one on grade accessible overhead door. The building uses an Early Suppression Fast Fire Sprinkler System.

The post Dee Zee Warehouse appeared first on Graham Construction.

]]>