Pennacle Construction partnered with PDM Precast in 2017 to build a new batch plant. The 5,200 SF facility consisted of
-
date: 02 Nov 2018
-
client: Maffitt Water Treatment Plant
-
location: Des Moines, IA
Maffitt Water Treatment Plant
Pennacle Construction was selected for their cost proposal and their voluntary cost and design alternates, which were based upon 20% complete construction documents. Pennacle Construction then worked directly with the owner and design team to complete construction documents. In working directly with the owner and design team, Pennacle Construction was able to help lower the cost of the plant below the original budget. The project was also scheduled so that final design and construction progressed simultaneously, with each part going out in separate bid packages, allowing the project to be finished within a shorter time frame.